Home

System Tour
 Building Characteristics
 Chillers
 Air Handlers
 Cooling Towers
 Pumps

Sensors
 Temperature
 Building Power
 Cooling Plant Power
 Water Flow
 Pressure

Hardware/Software
 Data Acquisition System
 Server/Networking
 Visualization Software
 Remote Web Access

IMDS Information
 Physical Points List
 Calculated Points List
 Point Name Reference
 Infrastructure Schematics
 Sample Plots




Go to:
 IMDS Project
 CBS Group
 BT Department
 EET Division
 LBNL Main

Building Power

 
Plug Load Power
Power Meter Enclosure
Main Power Meter
Main Power Panel

Whole building power, lighting power, and plug loads are measured using digital power transducers. These sample voltage and current waveforms at high speed and have powerful digital signal processing, assuring true RMS (Root Mean Square) output accurate to 0.5 percent. The power transducers are used in conjunction with 600V class split-core current transformers (CT's).

The panels shown here are located in the basement. No additional wiring was necessary to measure plug and lighting load separately. The components of whole building power that are measured individually are lighting, plug load, and cooling power. These do not add up to the whole building power; approximately 100kW of power is not measured. 
 
 See also: Cooling Plant Power

Points Measured
Power (kW)
Physical Points (5) Building Main Power, Lighting Load Riser One, Lighting Load Riser Two, Plug Load Riser One, Plug Load Riser Two
Calculated Points (2) Lighting Load Riser Power, Plug Load Riser Power
Normalized Power (wsf)
Calculated Points (4) Building Watts per Square Foot, Lighting Watts per Square Foot, Plug Load Watts per Square Foot, Cooling Load Watts per Square Foot 
 
 Total Points: 5 physical; 6 calculated
 
 
Power Transducer Accuracy
Current Transformer Accuracy
Combined Accuracy
Main - Whole Building (3 CT's)
0.50%
1.00%
1.50%
Light & Plug Risers (3 CT's each)
0.50%
0.50%
1.00%

Points Not Measured

These points are not metered independantly, but are included in Building Main Power: