Home

System Tour
 Building Characteristics
 Chillers
 Air Handlers
 Cooling Towers
 Pumps

Sensors
 Temperature
 Building Power
 Cooling Plant Power
 Water Flow
 Pressure

Hardware/Software
 Data Acquisition System
 Server/Networking
 Visualization Software
 Remote Web Access

IMDS Information
 Physical Points List
 Calculated Points List
 Point Name Reference
 Infrastructure Schematics
 Sample Plots




Go to:
 IMDS Project
 CBS Group
 BT Department
 EET Division
 LBNL Main

IMDS Functional Specification

This site contains complete information about the pilot IMDS system installed at the Hong Kong Bank Building in San Francisco, California, in 1998. Additional information about this project is available at the Diagnostics Project website.

This project was completed in 1999 and thus the information here is historic and may not be current. In 2000 and 2001 the building management independently implemented a controls retrofit which expanded the scope of the IMDS to all building systems and control functions. Information on this can be found here and here. There is also a specification for the second-generation site installed in Sacramento in 2002.


For more information about the web pages or web server of the Building Technologies Department or the Environmental Energy Technologies Division contact: sWebster 
© 1998 Lawrence Berkeley National Laboratory Building Technologies Department.
This web page last modified by SKinney on January 5, 2001.