Park Executive Office Building
Sacramento, California
Class A Office Building

Year Constructed: 1970

Gross Square Feet: 175,000
Floors leased: 14, plus mezzanine
Height: 172 feet

Steel-frame structure with concrete facade.
Four elevators

Space Heating:
Natural gas boiler, 65,000 kBtu input, 80% efficient. Two firing stages, primary only HHW loop w/two 3-hp pumps.

Cooling:
Two 300-ton centrifugal chillers. One is non-operational. Primarly only CCW loop w/20-hp pumps. Two-cell cooling tower.

Controls:
1998-vintage EMCS. Primarly pneumatic controls with some DDC.

HVAC Distribution:
Heating and cooling distributed through dual-duct CV system. Two duct zones per floor, approximately 35 mixing boxes per floor.

Lighting:
Compact fluorescent and T-8 lamps