Home

Hardware/Software

 Data Aquisition System
 Server/Networking
 Data Visualization

Building Plant

 Chillers
 Air Handlers
 Pumps
 Cooling Tower
 Boiler

Sensors

 Air Temperature
 Water Temperature
 Relative Humidity
 Building Power
 Cooling Plant Power
 Water Flow
 Air Flow

Data

 Points List
 Real-Time Data
 Baseline Data



Go to:
 IMDS Project
 CBS Group
 BT Department
 EET Division
 LBNL Main
IMDS Functional Specification


This site contains complete information about the IMDS system installed at the Park Executive Office Building in Sacramento, California. Additional information about this project is available at the Diagnostics Project website. There is also a specification for the San Francisco pilot site installed in 1998. Use the menu at left to navigate through the site.



For more information about the web pages or web server of the Building Technologies Department or the Environmental Energy Technologies Division contact: sWebster 
© 1998 Lawrence Berkeley National Laboratory Building Technologies Department.
This web site maintained by SKinney last modified on 1/15/03.